Cost Estimation of Road:
Cost Estimation of any construction works and projects are very necessary to forecast the probable cost that is to be spent for its completion. It is also very helpful to identify the different types of expenditures and cost which are categorized in different subdivisions. This helps to minimize the cost and time of completion as well as maximize the work performance and also an appropriate and adequate supply of materials and laborers required for the project.
In Highways, a different subdivision of works are done any Quantity and Cost Estimation of each different Activities or works are done separately which combined as last to get the final Detail Quantity Estimate, Abstract of Cost and Summary of Total Cost.
An Example of a Simple Road Construction Estimation is provided here. Breakdown of Simple Road Construction Work is as follows:
- EARTHWORK CALCULATIONS FOR ROADWAY
- EARTHWORK CALCULATIONS FOR DRAINS
- QUANTITY CALCULATIONS FOR GABION RETAINING WALL
- Masonry Retaining Structure Quantity Calculation
- Masonry Retaining Structure Quantity Calculation
- Quantity Estimation of DRAIN
- QUANTITY CALCULATION OF COVER FOR SIDE DRAIN
- MATRICES OF CROSS DRAINAGE WORKS
- Quantity Estimate of Pipe Culverts
- Quantity Estimate of Slab Culverts
- QUANTITY CALCULATIONS FOR PAVEMENT
- Summary of Rate
- RATE ANALYSIS
- RATE ANALYSIS FOR MAINTENANCE WORKS
- Chart for the collection of materials
- Norms for the collection of materials by machine
- TRANSPORTATION RATES FOR HAULAGE OF SOIL AT DISPOSAL SITES
- Transportation Analysis of Construction Materials
- Material Rates
- DETAIL QUANTITY ESTIMATE
- ABSTRACT OF COST
- SUMMARY OF COST